Project Description:
Context:
The project is situated BARDHMAN (West Bengal) .The site in the circulating area of the existing Bardhman railway station. Project:The proposed complex shall have 2 floors,R.C.C. frame structure.Ground floor having Shops ,Cyber Cafe, and Clinic. First floor a Multi-cuisine Restaurant, a Food Court. Total Built-up Area Is 518 Sq.Mt. and Project Cost Is 1.11 Cr.
Role of DAG:
Architecture, Structure, Electrical Engineering, Plumbing, HVAC, Fire Detection & Fire Fighting, Interiors and Periodic SupervisionStatus of Completion:It is completed in December 2010.